Der Zuschlag ist erteilt. Die Seite bleibt zum Nachschlagen erhalten.
Ähnliche offene Ausschreibungen
81320174 - International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria - Lot 1
Auf einen Blick
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH schreibt Allgemeine und berufliche Bildung (CPV 80000000) aus. Der Zuschlag ist erteilt. Verfahrensart: Offenes Verfahren.
Aus der Bekanntmachung
NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilization of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. Off-grid progress, particularly in mini-grids, is hindered by barriers such as limited forex access and technical capacity. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component. 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. New or improved laws, regulations or instruments to achieve the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy) 2. Support 5 states on their respective State Electricity Market through the development of policies, laws, or instruments to advance RE investment. The procedure is divided into two lots. This is Lot 1.
Eckdaten
Jede Angabe stammt aus der amtlichen Bekanntmachung, zuletzt geprüft am 9. November 2026, 20:30 Uhr (UTC+01:00).
- Status
- VergebenAmtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
- Frist
- Keine Frist in der BekanntmachungAmtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
- Auftraggeber
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, Eschborn, DEAmtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
- Haupt-CPV
- Allgemeine und berufliche Bildung (CPV 80000000)Amtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
- Verfahrensart
- Offenes VerfahrenAmtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
- Lose
- 1Amtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
- Erstmals veröffentlicht
- 27. Juli 2026, 17:04 Uhr (UTC+02:00)Amtliche Bekanntmachung · geprüft am 09.11.2026, 20:30 Uhr (UTC+01:00)
Faktenblatt

Lose (1)
Los LOT-0001: 81320174 - International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria - Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.
Verlauf
- 10. Juli 2026: Zuschlag. Zuschlag an: Inensus GmbH; Auftragswert: 1 € zzgl. MwSt.; Eingegangene Angebote: 4; Los LOT-0001.
- 27. Juli 2026, 17:04 Uhr (UTC+02:00): Zuschlagsbekanntmachung Bekanntmachung, Version 01 (Bekanntmachung vergebener Aufträge oder Zuschlagsbekanntmachung – Standardregelung). Amtliche Bekanntmachung
Auftraggeber und Ort
Auftraggeber
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Eschborn, DE
Weitere Beteiligte in der Bekanntmachung
- Inensus GmbH (Bieter), Gosslar
- Inensus GmbH (Zuschlag), Gosslar
Einordnung
CPV-Codes
- 80000000: Allgemeine und berufliche Bildung
Amtliche Unterlagen
In der indexierten Bekanntmachung wurden keine Unterlagen gefunden.
Fragen und Antworten
Wer ist der Auftraggeber?
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, Eschborn, DE.
Was wird beschafft (CPV)?
Allgemeine und berufliche Bildung (CPV 80000000).
Ist die Ausschreibung in Lose aufgeteilt?
Nein, die Bekanntmachung nennt ein einziges Los.
Welche Verfahrensart gilt?
Offenes Verfahren.
Wie gebe ich ein Angebot ab?
Über die amtliche Bekanntmachung oder das darin genannte Portal. Inteliwert gibt keine Angebote ab. Amtliche Bekanntmachung
Bin ich teilnahmeberechtigt?
Inteliwert beurteilt keine Teilnahmeberechtigung. Die Eignungskriterien stehen in der amtlichen Bekanntmachung. Amtliche Bekanntmachung
Weitere Ausschreibungen dieses Auftraggebers
Weitere veröffentlichte Ausschreibungen dieses Auftraggebers in den indexierten Bekanntmachungen, offene zuerst.
-
OffenAusschreibung
10043822-Implementation Support National Ecosystem Assessments in Saint Lucia and Saint Vincent and the Grenadines
Zuletzt geprüft am 11.11.2026, 07:11 Uhr (UTC+01:00)Amtliche Bekanntmachung -
OffenAusschreibung
Digitale Ausrüstungsgüter für Togo
Zuletzt geprüft am 10.11.2026, 07:11 Uhr (UTC+01:00)Amtliche Bekanntmachung -
OffenAusschreibung
10012255-Short Term Expert Support on Sustainable and Inclusive Mobility in Colombia
Zuletzt geprüft am 10.11.2026, 07:11 Uhr (UTC+01:00)Amtliche Bekanntmachung -
OffenAusschreibung
Vier (4) gebrauchte Sattelzugmaschinen inkl. Tiefbett-Auflieger
Zuletzt geprüft am 07.11.2026, 07:11 Uhr (UTC+01:00)Amtliche Bekanntmachung -
OffenAusschreibung
10015532-Durchführung und Konzeption von Trainings im Themenfeld Beratungsrollen und Beratungskompetenzen der AIZ (Los 1 Englisch)
Zuletzt geprüft am 07.11.2026, 07:11 Uhr (UTC+01:00)Amtliche Bekanntmachung
Quelle
- Herausgeber
- Bekanntmachungsservice
- Lizenz
- CC0 1.0
- Amtliche Bekanntmachung
- https://oeffentlichevergabe.de/ui/de/notices/198da9d6-1043-4d96-8509-5d4f809e3f02
- Zuletzt geprüft
- 9. November 2026, 20:30 Uhr (UTC+01:00)
Maßgeblich ist die amtliche Bekanntmachung. Inteliwert zeigt, was in ihr steht, und verlinkt sie.