OpenTender

European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA

At a glance

European X-Ray Free-Electron Laser Facility GmbH is procuring Laboratory, optical and precision equipments (excl. glasses) (CPV 38000000) in Hamburg (DE600). Procedure type: Negotiated with prior publication of a call for competition / competitive with negotiation.

From the notice

European X-Ray Free-Electron Laser Facility GmbH (European XFEL) is a non-profit limited liability company under German law. It operates the world’s largest X-ray laser, a 3.4-kilometre-long facility from the DESY campus in Hamburg to Schenefeld in Schleswig-Holstein. The laser generates ultrashort X-ray flashes 27,000 times per second, with a peak brilliance a billion times higher than that of the best conventional X-ray sources. The European XFEL is announcing a tender for the development and supply of superconducting undulator (SCU) modules as part of an afterburner project for the Hard X-ray line SASE2. This project will comprise a small series of SCU modules, with one module retained for measurement-system improvements and as a spare. The modules are designed to produce X-ray lasing at photon energies of ≥ 25 keV while operating at an electron beam energy of 16.5 GeV.

Key facts

Each fact is from the official notice, last checked 10 November 2026, 07:11 (UTC+01:00).

Status
OpenOfficial notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
Deadline
No deadline in the noticeOfficial notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
Buyer
European X-Ray Free-Electron Laser Facility GmbH, Schenefeld, DEOfficial notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
Place of performance
Hamburg (DE600)Official notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
Main CPV
Laboratory, optical and precision equipments (excl. glasses) (CPV 38000000)Official notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
Procedure
Negotiated with prior publication of a call for competition / competitive with negotiationOfficial notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
Lots
1Official notice · checked 10 Nov 2026, 07:11 (UTC+01:00)
First published
5 November 2026, 21:08 (UTC+01:00)Official notice · checked 10 Nov 2026, 07:11 (UTC+01:00)

Fact sheet

Inteliwert fact sheet: European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA — European X-Ray Free-Electron Laser Facility GmbH. A product of Bandpey GmbH.
The key facts of this page as an image (PNG, 1600 × 900), made from the official notice. © Bandpey GmbH; terms of use. Download the fact sheet

Lots (1)

  1. Lot LOT-0001: European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA

    Scope of Work After Award: The tender covers the following components and requirements: Superconducting Undulator Modules: Composition: Small series of five with an option of sixth SCU module, each approximately 5 meters long. Installation: The SCU modules will be positioned after the existing 35 permanent magnet undulator modules of the SASE2 line at European XFEL Technical design report: A Technical Design Report (TDR) for one representative SCU module must be provided after award to EuXFEL for review and approval Tests: An intermediate test of all the SCU magnets in a liquid-helium (LHe) vertical cryostat at DESY (SUNDAE1), carried out under the responsibility of EuXFEL, is foreseen to train and characterize the magnetic field. The acceptance tests of each SCU module include: factory acceptance test (FAT) and three site acceptance tests: the first SAT which includes magnetic characterization, SAT2 in the tunnel without beam and SAT3 in tunnel with beam. Timeline: The fifth SCU module must be delivered latest by June 2032, and the sixth optional SCU module, if the option is exercised, latest by June 2033. Technical Specifications include: Magnetic Configuration: Each SCU module consists of two 2 m long SCU magnets, each with: Vacuum stay-clear: 5 mm Period: 18 mm Peak magnetic field: ≥ 1.82 T The root mean square of the relative variation of the undulator parameter defined over half period must be smaller than 0.004 The range of the relative variation of the undulator parameter defined over half period must be smaller than 0.012 Shimming coils must be applied in case the undulator parameters mentioned above are not reached in the measurement in SUNDAE1: root mean square of the relative variation of the undulator parameter defined over half period larger than 0.004 and /or the range of the relative variation of the undulator parameter defined over half period larger than 0.012. Components: - A cryostat for thermal isolation consisting of a vessel and several thermal shields. - An electron beam vacuum chamber (EBC) with the following functions: separating the isolation vacuum, where the superconducting magnets are located, from the ultra high vacuum where the electron beam moves, shielding the superconducting magnets from beam heat load. - Two SCU magnets, each consisting of a top and bottom coil held together by a support structure, equipped with correction coils. - Horizontal and vertical Helmholtz coils at the exit of the upstream SCU magnet and at the entrance of the downstream SCU magnet. - A phase shifter to manage phase mismatch between the two SCU magnets. A support structure holding together the Helmholtz coils and the phase shifter. This support structure and the ones of the SCU magnets must keep the superconducting magnets at the final gap and have to be designed and manufactured to fit in the magnetic gap precisely machined rails to guide a sledge with Hall probes. The sledge with Hall probes will be provided by EuXFEL. This is needed to perform the test in SUNDAE1 mentioned above. The contract will provide for a firm obligation to supply five (5) SCU modules. In addition, the contract will include an option entitling EuXFEL, at its sole discretion, to order one (1) additional (sixth) SCU module with the same technical specifications and on the same contractual terms. The option shall lapse if EuXFEL does not exercise it by the end of July 2029. EuXFEL is under no obligation to exercise the option. Further details will be set out in the procurement documents, including the complete technical specification, which will be provided to the selected candidates following completion of the selection stage and submission of the confidentiality agreement.

    CPV
    Laboratory, optical and precision equipments (excl. glasses) (CPV 38000000)
    Place
    Hamburg (DE600)

Timeline

  1. 5 November 2026, 21:08 (UTC+01:00): Original notice Notice, version 01 (Contract or concession notice – standard regime). Official notice

Buyer and place

Buyer

European X-Ray Free-Electron Laser Facility GmbH
Schenefeld, DE

Place of performance

  • Hamburg (DE600)

Classification

CPV codes

  • 38000000: Laboratory, optical and precision equipments (excl. glasses)

NUTS regions

  • DE600: Hamburg

Official documents

Links go to the publisher. Inteliwert does not copy the documents.

Questions and answers

Who is the buyer?

European X-Ray Free-Electron Laser Facility GmbH, Schenefeld, DE.

What is being procured (CPV)?

Laboratory, optical and precision equipments (excl. glasses) (CPV 38000000).

Where is the work performed (NUTS)?

Hamburg (DE600).

Is it divided into lots?

No, the notice names a single lot.

Which procedure is used?

Negotiated with prior publication of a call for competition / competitive with negotiation.

How do I submit a bid?

On the official notice or the portal it names. Inteliwert does not submit bids. Official notice

Am I eligible?

Inteliwert does not judge eligibility. The selection criteria are in the official notice. Official notice

More from this buyer

Other published opportunities of this buyer in the indexed notices, open ones first.

Source

Publisher
TED
Last checked
10 November 2026, 07:11 (UTC+01:00)

The official notice is authoritative. Inteliwert shows what the notice states and links to it.

Markdown version