Subsea Inspections 2027+

At a glance

Trianel Windkraftwerk Borkum GmbH & Co. KG is procuring Offshore installation services (CPV 76521000) in Extra-Regio NUTS 3 (DEZZZ). Procedure type: Negotiated with prior publication of a call for competition / competitive with negotiation.

From the notice

Yearly subsea inspection works comprising ROV inspections on offshore foundations and scour survey of the seabed for the years 2027, 2028 and 2029 with an optional prolongation for additional 2 x 1 year.

Key facts

Each fact is from the official notice, last checked 7 November 2026, 08:30 (UTC+01:00).

Status
OpenOfficial notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
Deadline
No deadline in the noticeOfficial notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
Buyer
Trianel Windkraftwerk Borkum GmbH & Co. KG, Aachen, DEOfficial notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
Place of performance
Extra-Regio NUTS 3 (DEZZZ)Official notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
Main CPV
Offshore installation services (CPV 76521000)Official notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
Procedure
Negotiated with prior publication of a call for competition / competitive with negotiationOfficial notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
Lots
1Official notice · checked 7 Nov 2026, 08:30 (UTC+01:00)
First published
21 September 2026, 11:42 (UTC+02:00)Official notice · checked 7 Nov 2026, 08:30 (UTC+01:00)

Fact sheet

Inteliwert fact sheet: Subsea Inspections 2027+ — Trianel Windkraftwerk Borkum GmbH & Co. KG. A product of Bandpey GmbH.
The key facts of this page as an image (PNG, 1600 × 900), made from the official notice. © Bandpey GmbH; terms of use. Download the fact sheet

Lots (1)

  1. Lot LOT-0001: Subsea Inspections 2027+

    The Scope of Work shall comprise the following two subsea inspections of the Trianel Windpark Borkum: - Scope of Work 1 (SOW1) - ROV Inspection: Biannual inspection of the foundations and the cable exits to determine the current condition by means of visual recording and measurement. TWB plans to do inspections at 20 tripod locations and one offshore substation site every two years. - Scope of Work (SOW2) - Scour Survey: Biannual survey of scour formation with the aid of bathymetric survey using multibeam echosounder equipment (MBES). The depth profile of the seabed is to be measured in a radius of 50 meters from the centre of the foundation structure. TWB plans to do inspections at 40 tripod locations and one offshore substation site every two years.

    CPV
    Offshore installation services (CPV 76521000)
    Place
    Extra-Regio NUTS 3 (DEZZZ)

Timeline

  1. 21 September 2026, 11:42 (UTC+02:00): Original notice Notice, version 01 (Contract or concession notice – standard regime). Official notice

Buyer and place

Buyer

Trianel Windkraftwerk Borkum GmbH & Co. KG
Aachen, DE

Place of performance

  • Extra-Regio NUTS 3 (DEZZZ)

Classification

CPV codes

  • 76521000: Offshore installation services

NUTS regions

  • DEZZZ: Extra-Regio NUTS 3

Official documents

Links go to the publisher. Inteliwert does not copy the documents.

Questions and answers

Who is the buyer?

Trianel Windkraftwerk Borkum GmbH & Co. KG, Aachen, DE.

What is being procured (CPV)?

Offshore installation services (CPV 76521000).

Where is the work performed (NUTS)?

Extra-Regio NUTS 3 (DEZZZ).

Is it divided into lots?

No, the notice names a single lot.

Which procedure is used?

Negotiated with prior publication of a call for competition / competitive with negotiation.

How do I submit a bid?

On the official notice or the portal it names. Inteliwert does not submit bids. Official notice

Am I eligible?

Inteliwert does not judge eligibility. The selection criteria are in the official notice. Official notice

Source

Publisher
Bekanntmachungsservice
Licence
CC0 1.0
Last checked
7 November 2026, 08:30 (UTC+01:00)

The official notice is authoritative. Inteliwert shows what the notice states and links to it.

Markdown version